In an effort to get more people on the vehicle, we decided to reinforce the top structure and allow people to stand on the upper level. This was achieved by bracing a 8 foot wide I-Beam to the truck frame and using that as a load carrying support.
In addition, the major improvements included:
Significantly lighter and more usable drawbridge
Larger sound system,
Funcional PA system controlled by the driver
Improved operating protocols
Playa Palace Build at Crash IndustriesWelding the draw bridge support
The whole build process of the vehicle was achieved in under 5 weeks from purchase to arriving on the Playa. Overall it was successful but a very stressful build.